Photos of the room construction progress
The room is much more spacious without the bookshelves (but it means no more prototype projector stand!)
The Culprit! This bad 256mb DIMM kept IW-SMARTBOARD3 from booting. Many fruitless hours with tech support didn't help.
IW-SMARTBOARD3 and IW-CONTROLPANEL
The room with the lights off and projectors going gives you a feel of what the room will be like to work in.
Rito tried lots of different screen materials (including large post it notes) and created a prototype mirror
This area is where all the computers and projectors and so on go. It does get a bit warm in there.
the current lighting, which is planned to be replaced.
Looking down through the prototype table light box to the prototype mirror assembly
The partition wall, that may eventually have a 12 screen mural on it. Currently planned to have a normal white board and tack board.
The table with legs and no light box.
Table and Wall with images
The table projector and prototype (2nd draft) mirror assembly
The control panel tablet running the very early super pre pre alpha control panel prototype
The Table with the post it note screen and light box.
The smartboard displays taped out on plastic wall
Testing handwriting recognition software on the tablet, which is very useful for taking notes.
Projection wall